Reduce Intervention Risk by up to 20–30% With the Veltrix System

A system that defines the isolation — not the worker.


Machine-based isolation logic

Pre-defined lockout points (no guessing)

Task-specific execution rules


Get Checklist Pack

From LOTO to LOTOTO to Veltrix

Most lockout systems are designed for one thing:

full energy isolation — in every situation.

But real industrial operations don’t work like that.

In maintenance, troubleshooting, and adjustments,

energy is often required to perform the work.

This is where traditional systems start to fail.

Veltrix introduces a different approach:

not one rule for everything — but the right method for each situation.

✔ Routine LOTOTO — when full isolation is possible

✔ ACP (fast intervention) — for short, controlled tasks

✔ Task-specific procedures — when energy must remain

A system that adapts to reality — not theory.

Get the LOTOTO Checklist Pack

VELTRIX™ Industrial LOTOTO System

WHY VELTRIX EXISTS

One accident changes everything.

A serious industrial injury revealed a critical truth:

traditional safety systems don’t fail on paper —

they fail in real operations.

That moment became the starting point of Veltrix.

Not another documentation system.

A system built for execution.

Designed from real risks.

Tested in real environments.

Built to prevent what should never happen again.

OUR STRENGTHS

9500+

Alternative Control Procedure (ACP) Development


4500+

LOTOTO System Documentation

2300+

Task-Specific LOTOTO Procedure Development

FREQUENTLY ASKED QUESTIONS

What makes the Veltrix LOTOTO system different?

It is built on a structured system:

  1. Routine LOTOTO for standard operations
  2. ACP (Alternative Control Procedure) for short, repetitive tasks (e.g. doors, guards)
  3. FS (Task-Specific Procedure) for defined maintenance activities

Each procedure defines:

  1. what can be done
  2. which energy sources are required
  3. which must be isolated

This ensures safe execution — not just compliance.

How long does it take to implement a LOTOTO system?

It depends on several factors:

  1. the complexity of the machinery or production line
  2. the number of energy sources involved
  3. the availability and cooperation of internal specialists

Each project is planned with a clear structure and timeline — from assessment to full implementation.

Is it possible to request a quote online?

Yes — but real systems require real assessment.

Most projects need an on-site evaluation

to fully understand the complexity and risks.

However, we can start online —

to define scope, expectations, and next steps.

Request Checklist Pack

Our address: 5600 Békéscsaba, Franklin utca 149.

Phone: +36702729071 E-mail: safetyfirstbau@gmail.com

Tell us about your system and we’ll send you the LOTOTO Checklist Pack.